25-MS Phillips Flange 3-1/8 ODC Male Coupling (If item not in stock and is long lead time, use 731B instead)
SKU
25-MS
Brand:

25-MS Phillips Flange 3-1/8 ODC Male Coupling (If item not in stock and is long lead time, use 731B instead)

25-MS Phillips Flange 3-1/8" ODC Male Coupling (If item not in stock and is long lead time, use 731B instead)
Add to Quote to request pricing
Details
25-MS Phillips Flange 3-1/8" ODC Male Coupling (If item not in stock and is long lead time, use 731B instead)Features:Forged A105 Steel300 PSI Rating, -50°F to +400°FTongue & Groove Flange FacingsAvailable with Threaded, Socket Weld, Weld Neck (AKA Butt Weld), and ODC/ODS ConnectionsCRN 0B11183.5C
More Information
More Information
Weight 4.900000
Condition New
Brand Phillips
Flange Connection ODC Male
Type Male
Nominal Pipe Size 3-1/8"
Reviews
Product Questions