20-1018 Hansen HLLSW Long Leads for Purger Switch Kit
SKU
20-1018
Brand:

20-1018 Hansen HLLSW Long Leads for Purger Switch Kit

20-1018 Hansen HLLSW Long Leads for Purger Switch Kit
Web Price $651.30 List Price $955.00 List Price $955.00
Details
These Hansen refrigerant liquid level float switches (HLL Series) are used to electrically indicate or control a liquid level by opening or closing a SPDT switch. Their simple, reliable design provides long life performance for almost any applicationApplicationsThese refrigerant liquid level float switches are typically installed on a vessel's liquid level column. They can control liquid level by controlling a liquid fill solenoid valve. Often, they are used to provide high level cutout or alarm. In addition, they can be used to turn off a recirculating liquid pump if a low level occurs. Other applications include control of liquid level via a liquid exit solenoid valve, level indication via a pilot light, and transfer drum operation.Features:MagnetLever ArmClear Housing Hermetically SealedOption Heater1/2" NPSM Conduit Connection (Option DIN Plug)Side ViewRetaining ScrewUpper Spring3/4" FPT/1" Buttweld Connection HLLS, HLLSC OnlyLower SpringHigh Pressure Tested Float BallWelded Tank and Neck Assembly Eliminates Gasket Leak PotentialAttractorGrooveSwitch Assembly Position Rotates 360°Option Metal CoverHeavy Duty 10 Amp SPDT Switch
More Information
More Information
Weight 3.000000
Condition New
Brand Hansen
Width 11
Height 7
Length 7
Reviews
Product Questions